Friday, June 28, 2013

Work continues

We are down to the little stuff. The big stuff is completed. Including the kitchen . . .







The master bathroom . . .



And the guest bath . . .


We have beautiful french doors in the Master bedroom and got window installed in the upstairs porch.




















We just have the "little" stuff to do that Peter can do with a little help from me. The little stuff may take us the better part of 5 years, so maybe it isn't so little . . .

The little stuff includes installing the subfloor on the upstairs porch (no the sunroom) . . .